
Winsor Dam
The main dam of the Quabbin Reservoir
Winsor Dam is the main dam of the Quabbin Reservoir, an earthen dam across the Swift River at the south-west corner of the reservoir in Belchertown, inside Quabbin Park. It and Goodnough Dike were built in the 1930s and together hold back 412 billion gallons of water. The visitor center is at its west end, and you can walk or bike across the top for free. Cars are not allowed on it.
Frank E. Winsor, the Quabbin project's chief engineer, died in 1939, the year the reservoir began to fill, before the water ever reached the spillway.
Winsor Dam at a Glance
How to Visit Winsor Dam
Turn in at Quabbin Park's West (main) entrance on Route 9 in Belchertown, 100 Winsor Dam Road, and park at the Administration Building, where the visitor center is. The dam starts at the rotary beside the building. Cars are kept off both the dam and Goodnough Dike for security, so the dam is a walk, not a drive. On a mild winter day, bring bikes and helmets and ride across.
Parking at the main entrance is limited. If it's full, the rest of Quabbin Park is through the Middle and East entrances on Route 9, but there is no driving from there to the dam.
The Spillway and the Y Pool
At the north end of the dam, the spillway carries overflow out of the reservoir once the water reaches a set level. When the reservoir is full and the spillway is running, you can see a waterfall from the Spillway Bridge and from the trail below it. The spillway water and the water released from the power station meet below the dam in the "Y" Pool, named for its shape from above. That is also where the rerouted Swift River rejoins its original bed and flows south.
The reservoir first reached the spillway in 1946, seven years after filling began on August 14, 1939.
Walks Around the Dam
- Visitor Center Loop Trail (pink, 1.7-mile loop): starts inside the rotary on the dam, drops through hemlocks to the Swift River and the Y Pool, and climbs a ridge back to the visitor center.
- Spillway Trail (brown, 1.1-mile loop): from the Spillway Bridge, along the old bed of the Rabbit Run railroad, with a clearing that looks across the Y Pool to Winsor Dam.
Full trail details are on the trail map page.
Fly Fishing Below Winsor Dam
The Swift River from the Y Pool down to Route 9 is the one place in Quabbin Park where fishing is allowed, and it is open all year: fly fishing only, catch and release, from 4 a.m. to 9 p.m. Wading in waders is allowed. A no-trespassing zone surrounds the power station, and the river, the Y Pool and the Route 9 parking area are closed from 11 p.m. to 4 a.m. Reservoir fishing rules are separate; see the fishing guide.
A Short History
- 1938: Goodnough Dike, the reservoir's second dam, is completed.
- August 14, 1939: the reservoir begins to fill. Frank E. Winsor, the chief engineer, dies the same year.
- 1946: water first flows over the spillway.
For the bigger story, see Quabbin history and Goodnough Dike.
Rules on the Dam
No dogs, even on a leash; no drones; no alcohol. Obey posted security signs. The dam is open during Quabbin Park's posted hours; see hours.


Winsor Dam FAQ
Where is Winsor Dam?
In Quabbin Park, Belchertown, at the West (main) entrance on Route 9, 100 Winsor Dam Road. The Quabbin Visitor Center is at its west end.
Can you walk across Winsor Dam?
Yes. Walking and biking across Winsor Dam are free. Cars are not allowed across it.
Who was Frank E. Winsor?
The chief engineer of the Quabbin project. He died in 1939, the year the reservoir began to fill.
When was Winsor Dam built?
In the 1930s, with Goodnough Dike (completed 1938). The reservoir began filling on August 14, 1939, and first flowed over the spillway in 1946.
Can you fish at Winsor Dam?
Only below it: the Swift River from the Y Pool to Route 9 is open all year for catch-and-release fly fishing, 4 a.m. to 9 p.m.
Sources
- DCR: Quabbin Reservoir fishing guide (read October 18, 2026)
- DCR: Quabbin Reservoir Watershed System public access summary (read October 18, 2026)
- DCR-DWSP StoryMap: Tower Trail guide (read October 18, 2026)
- DCR-DWSP StoryMap: Visitor Center Loop guide (read October 18, 2026)
- DCR-DWSP StoryMap: Spillway guide (read October 18, 2026)
- DCR-DWSP StoryMap: Quabbin Park Cemetery tour (read October 18, 2026)
- DCR-DWSP StoryMap: Goodnough Dike vista guide (read October 18, 2026)
- DCR: Be a History Detective at Quabbin Reservoir (Trip-Tip) (read October 18, 2026)
- MWRA: Water system history (read October 18, 2026)
- DCR: The Quabbin Reservoir and the laws that shaped it (read October 18, 2026)
- National Park Service: Dana Common (read November 2, 2026)
Facts checked against the DCR page for Quabbin Reservoir on October 18, 2026. Where this site and the agency differ, the agency is right.
New England park reminders by email
One email the week before the big New England state-park booking dates (Maine's season day, Massachusetts' camping opening day, Acadia's Cadillac Summit Road releases). Nothing else.
Before any reminder, you'll get one email asking you to confirm. Unsubscribe anytime. See the privacy policy.
Photo credits
- quabbin-dam-crest-walkers.jpg: AI-generated illustration
- quabbin-stone-spillway-channel.jpg: AI-generated illustration
- quabbin-earthen-dam-mown-slope-hero.jpg: AI-generated illustration